Removed all clecoes on lower longerons and removed baggage floor supports. Deburred supports, longerons and longerons doublers. Reassembled all parts. Riveted aft end of baggage floor supports to S4. Fit baggage floor and sides. Eased top edge of baggage floor pieces at overlap to sides.